Use the quotation to plan, then keep the job current.
When a confirmed quotation becomes a job, its sell charges and expected buy costs provide an operational starting point. Update your team’s view as shipment details and vendor charges become clearer. If the route, cargo, or scope changes, note what needs repricing or a supplemental bill.
Expected costs are useful for comparing the plan with vendor documents. They remain estimates, however, and do not count as actual cost or profit in Freight P&L.
Match each cost sheet to its job and vendor document.
Create a vendor cost sheet against the relevant job. Enter the vendor, invoice or bill of lading reference when available, date, cost lines, currency, exchange rate, and GST details. Compare the lines with the vendor invoice before confirming the sheet.
A draft cost sheet is an estimate. Confirm it when the vendor charge is supported. Record the vendor payment against the cost sheet so the job’s cost reporting reflects a paid cost. If a confirmed vendor cost later needs a reduction, use a debit note instead of rewriting the original record.
Compare issued customer bills with actual vendor costs.
EasyHisab Freight’s dashboard and Freight P&L show billed, cost, profit, and margin before GST. Issued freight bills and issued credit notes determine billed revenue; confirmed and paid cost sheets and vendor debit notes determine cost. Draft bills and draft costs are estimates and are shown separately from actual profit. GST collected and GST on vendor bills appear alongside profit because GST is not part of it.
Use the job view to inspect an individual shipment. Use Freight P&L to compare jobs across a chosen period and review billed and cost trends.
Convert USD vendor bills at the rate on the sheet.
A shipping line may bill ocean freight in USD while terminal charges come in INR. Enter each line in its own currency; the cost sheet converts USD lines to INR at the exchange rate you enter, so job cost, profit and Freight P&L are always in rupees and comparable across jobs.
GST and TDS change balances, not job profit.
Job profit is billed revenue minus vendor cost, both before GST. GST on vendor bills appears beside profit for your CA, not inside it. TDS you withhold, whether GST TDS or 194C, reduces what you still owe the vendor; it doesn’t make the shipment cheaper. Read the TDS guide.
One vendor bill, one cost sheet, once.
Confirming a cost sheet needs the vendor’s invoice number, and the same number can’t be confirmed twice for that vendor in one financial year. A duplicate bill is stopped at the desk, before it doubles a job’s cost. When a vendor later reduces a bill, record a debit note rather than editing the confirmed sheet.
When everything is billed and costed, close the job. Reopening a closed job needs a written reason, which stays in its activity history.
A practical month-end review
- Check open jobs for unbilled customer charges.
- Match vendor invoices to cost sheets and confirm supported amounts.
- Record vendor payments and apply debit notes when a cost is reduced.
- Review job profit and margin before GST; investigate material estimate-to-actual changes.
Common questions
Does TDS withheld from a vendor reduce the job cost?
No. TDS changes what you still owe the vendor, not what the shipment cost. Job profit uses the cost before GST, so GST and TDS stay out of it.
Are draft vendor costs counted in job profit?
No. Draft cost sheets are estimates and are shown separately. Profit uses issued customer bills and confirmed vendor costs, net of credit and debit notes.
Can one job have costs from several vendors?
Yes. Add a cost sheet for each vendor bill: the shipping line, the terminal, the transporter, the customs agent. Each one adds to the job's cost when you confirm it.